From: Vit on 13 May 2008 23:01 Hi, I'm looking for the opportunity to show in Ms Project Professional a warning, when I try to allocate a resource from the enterprise, that is already allocated... I'm working with the 2007 infrastructure (MS Proj Pro, PWA, Proj Server, MOSS). if I look at the PWA view, I can see the resource availability... I'm looking for (if it is possible) the opportunity to insert a warning message (or something similar) in MS Project Professional, when I try to allocate a Resource that is already allocate (without have to look at the resource availability in pwa) thanks so much to everybody cheers Vit
From: G�rard Ducouret on 14 May 2008 03:05 Hello Vit, In the Assign Resource dialog of Project Pro, you have the option :Available to work : x hours on the selected task. Hope this helps, G�rard Ducouret "Vit" <FiNaR76(a)gmail.com> a �crit dans le message de news: 51ad4544-bb7d-4f72-9ac4-d66e83a9f34f(a)f24g2000prh.googlegroups.com... > Hi, > > I'm looking for the opportunity to show in Ms Project Professional a > warning, when I try to allocate a resource from the enterprise, that > is already allocated... > > I'm working with the 2007 infrastructure (MS Proj Pro, PWA, Proj > Server, MOSS). > > if I look at the PWA view, I can see the resource availability... > > I'm looking for (if it is possible) the opportunity to insert a > warning message (or something similar) in MS Project Professional, > when I try to allocate a Resource that is already allocate (without > have to look at the resource availability in pwa) > > thanks so much to everybody > > cheers > > Vit
|
Pages: 1 Prev: working hours problem Next: importing %complete from excel |