From: ProjectWoman on 4 May 2008 17:36 The remaining work for a task or a rollup does not equal the sum of the future work in the time phased grid. After statusing a task (or the entire project), we use the Update Project function to push the remaining work after the status date. The status date does not fall on the calendar month end but rather on a Friday of the fiscal month. The result is that the sum of the weekly time phased work does not equal the Remaining Work total that is displayed in the Task Remaining Work column. This means that the sum of the detail does not equal the total.
|